Oneintervention Trademark Details
Word Mark | Oneintervention |
---|---|
Status | Alive 630 — New Application - Record Initialized Not Assigned to Examiner |
Current Owner
Schlumberger Technology Corporation of Sugar Land, TX
View all trademarks for Schlumberger Technology CorporationSerial Number | 87171524 |
---|---|
Status Date | Monday, September 19, 2016 |
Filing Date | Monday, September 19, 2016 |
Attorney | Margaret A. Boulware |
Correspondent
MARGARET A. BOULWARE
BOULWARE & VALOIR
THREE RIVERWAY
SUITE 950
HOUSTON, TX 77056
BOULWARE & VALOIR
THREE RIVERWAY
SUITE 950
HOUSTON, TX 77056
Case File Statements
Goods & Services | Software, tools and instruments to improve well and reservoir performance to maximize, extend, and optimize recovery and reservoir drainage and to in the field of of oil, gas, geothermal, and water wells used in association with coil tubing, wireline, slickline, capillary tubing, jointed pipe, and solid rods; software, hardware and instruments for matrix and fracture stimulation, wellbore cleanout, logging, wellbore profiling, plug-and-abandonment, perforating, nitrogen kickoff, sand control, drilling, cementing, well circulation, and mechanical isolation |
---|---|
Goods & Services | Providing services in the field of oil, gas, geothermal, and water wells to maximize, extend, and optimize recovery and reservoir drainage used in association with coil tubing, wireline, slickline, capillary tubing, jointed pipe, and solid rods; and services for matrix and fracture stimulation, wellbore cleanout, logging, wellbore profiling, plug-and-abandonment, perforating, nitrogen kickoff, sand control, drilling, cementing, well circulation, and mechanical isolation for oil, gas, geothermal, and water wells |
Goods & Services | Technical consulting in the field of production of oil, gas, geothermal, and water wells to maximize, extend, and optimize recovery and reservoir drainage in association with coil tubing, wireline, slickline, capillary tubing, jointed pipe, and solid rods, matrix and fracture stimulation, wellbore cleanout, logging, wellbore profiling, plug-and-abandonment, perforating, nitrogen kickoff, sand control, drilling, cementing, well circulation, and mechanical isolation; consulting in the design and development of hardware and software in the field of production of oil, gas, geothermal, and water wells to maximize, extend, and optimize recovery and reservoir drainage in association with coil tubing, wireline, slickline, capillary tubing, jointed pipe, and solid rods, matrix and fracture stimulation, wellbore cleanout, logging, wellbore profiling, plug-and-abandonment, perforating, nitrogen kickoff, sand control, drilling, cementing, well circulation, and mechanical isolation |
Pseudo Mark | One Intervention |
Classifications
International Class Codes |
009
|
---|---|
U.S. Class Codes | 021, 023, 026, 036, 038 |
Status | 6 — Active |
Status Date | Monday, September 19, 2016 |
Primary Code | 009 |
International Class Codes |
040
|
---|---|
U.S. Class Codes | 100, 103, 106 |
Status | 6 — Active |
Status Date | Monday, September 19, 2016 |
Primary Code | 040 |
International Class Codes |
042
|
---|---|
U.S. Class Codes | 100, 101 |
Status | 6 — Active |
Status Date | Monday, September 19, 2016 |
Primary Code | 042 |
Trademark Timeline
-
Sep 14 2016Trademark application filed with USPTO
-
Sep 17 2016New Application Entered In Tram
-
Sep 19 2016New Application Office Supplied Data Entered In Tram
-
Sep 20 2016Notice of Pseudo Mark E-Mailed